More Than A Cabinet Swap

A real kitchen remodel usually touches more than cabinets and countertops: plumbing, electrical, flooring, and sometimes a wall. GNG handles the whole scope as one project instead of coordinating a handful of separate subs.

Kitchens are one of two rooms we cover in detail under remodels and additions. Doing both rooms at once is common, so see bathroom remodeling as well. If a wall has to come out, that is structural work, and if the house has reached the point where you are weighing a renovation against starting fresh, look at building a custom home instead.

// What We Coordinate

Everything Under One Roof

Cabinets and countertops
Plumbing and electrical relocation
Flooring
Structural changes, including removing walls
Lighting and fixtures
Permits and inspections

// Definition

What A Kitchen Remodel Actually Involves

Cabinets are the last twenty percent of the job.

A kitchen remodel is a construction project with cabinets at the end of it. The work runs in a fixed order: demolition, structural work if a wall is coming out, plumbing and electrical rough-in, inspection, drywall, flooring, cabinet installation, countertop templating, countertop installation, and then plumbing and appliance final connections. Skipping around that order is what produces kitchens where the outlets end up behind the refrigerator.

Two steps in that list are the ones homeowners rarely plan for. Countertop templating cannot happen until the cabinets are set and level, and there is a fabrication lead time afterward, so the kitchen sits without a counter or a working sink during it. And rough-in inspection has to pass before drywall closes the walls, which means the county's schedule is on your critical path whether you like it or not.

The finishes are the fun part and the last part. Everything that decides whether the kitchen works happens while the walls are open.

// Straight Answers

Kitchen Remodeling Questions, Answered

Can you remove a wall to open up my kitchen?

Usually yes, but it depends on whether the wall is load bearing. A load-bearing wall carries weight from the roof or the floor above, and removing one means transferring that load into a beam with posts and a load path that runs all the way to the footing. That is structural work, not demolition, and it is the most common thing that turns a kitchen remodel into a permitted project. We check what the wall is doing, including what is running inside it, before quoting.

How long does a kitchen remodel take?

It runs in a fixed sequence: demolition, structural work, plumbing and electrical rough-in, inspection, drywall, flooring, cabinets, countertop templating, countertop installation, then plumbing and appliance final. Templating is the step nobody plans for, because the fabricator cannot measure until the cabinets are set, and the stone has a lead time after that. A layout change adds inspection steps a cosmetic refresh does not have. You get a written schedule with the estimate.

What drives the cost of a kitchen remodel?

Cabinetry and countertops are the biggest line items, but what moves the total most is whether the layout changes. Keeping the sink, range, and refrigerator where they are keeps plumbing and electrical work small. Moving the sink means moving a drain, and drains need slope and venting, which can mean opening a floor or the ceiling below. Older homes add another variable, since wiring behind the walls often has to be brought current once it is exposed.

Do I need a permit for a kitchen remodel?

It depends on what the work touches, and the rule is local rather than statewide. Replacing cabinets and counters in the same layout generally does not require one. Moving plumbing, adding or relocating circuits, and removing a load-bearing wall generally do. We pull whatever the jurisdiction requires and schedule the inspections as part of the job, so it is not something you have to chase down yourself.

Does flooring go in before or after the cabinets?

It depends on the flooring. Continuous flooring such as tile or hardwood generally goes down before the cabinets, so the floor runs unbroken and appliances can be pulled out later without hitting a lip. Floating floors such as many click-lock products generally go in after, because cabinets sitting on a floating floor restrict the movement the floor needs. We sequence it to the product you choose rather than to habit.

How long will I be without a sink?

Longer than most people plan for, because the sink cannot be set until the countertop is in, and the countertop cannot be fabricated until the cabinets are installed and templated. That means the gap runs from demolition through templating, fabrication, and installation. Set up a temporary station before demolition day with a place to wash dishes, the refrigerator on a working outlet, and a microwave. We give you the dates with the schedule.

// Behind The Cabinets

The Work You Will Never See Again

Once the drywall goes back up, three things are sealed in for the life of the kitchen: the plumbing, the electrical, and whatever structure carries the load overhead. Those are the parts worth getting right, because correcting any of them later means taking the new kitchen apart.

On plumbing, the constraint people underestimate is that drains need slope and venting, not just a pipe. Moving a sink across a room is straightforward on paper and can mean opening the ceiling below to run a properly sloped drain and a vent. On electrical, kitchens carry the heaviest load in the house, and modern requirements generally call for dedicated small-appliance circuits and ground-fault protection at countertop receptacles. In an older Northeast Indiana home, that often means the panel gets looked at too.

On structure, a removed wall has to be replaced by a beam sized for the load, sitting on posts, over a load path that continues down to something solid. A header that carries a roof load is not the same as one carrying a floor.

GNG is an Amish-owned family business in Grabill, licensed and insured, building in Northeast Indiana for more than 34 years, with a 10-year craftsmanship warranty on the work. The crew that opens your walls is the crew that closes them. Read about the family behind GNG.

Composite deck and stairs construction in Northeast Indiana

// FAQ

Kitchen Remodeling Questions

Can you remove a wall to open up my kitchen?

In many cases, yes. We'll evaluate whether the wall is load-bearing and handle the structural work if it is.

Do you coordinate plumbing and electrical work?

Yes, moving a sink, adding outlets, or relocating fixtures is handled in-house as part of the remodel.

How long does a kitchen remodel usually take?

It depends on the scope, a cosmetic refresh takes far less time than a full layout change. We'll give you a specific timeline with your estimate.

Do I need a permit for a kitchen remodel?

It depends on what the work touches, and the rule is local rather than statewide. Replacing cabinets and countertops in the same layout generally does not require a permit. Moving plumbing, adding or relocating circuits, and removing a load-bearing wall generally do. We pull whatever the local jurisdiction requires and schedule the inspections as part of the job.

Can you remodel the kitchen without moving the plumbing?

Yes, and it is often the smart call. A kitchen that keeps its sink, range, and refrigerator in place can still change completely through cabinetry, countertops, lighting, and flooring, at a fraction of the disruption of a layout change. We lay out both options with the estimate so you can see what the layout change is actually buying you.